8×20 Single Door

Standard option

Starting from

$2,800 each
  • 160 sq ft ($17.50/sq ft)
  • Single door on end
  • Roll-up or standard doors
  • Professional installation available
  • Flat-pack shipping (14 units/container)
  • Up to 10-year warranty
Configure & Order

4-Unit Container

Maximum density

Starting from

$4,000 each
  • 4 units of 40 sq ft each
  • $25/sq ft total
  • Individual doors per unit
  • Maximizes rental income
  • Perfect for smaller storage needs
  • Higher revenue per container
Configure & Order

Full Service, Full Transparency

📦

Shipping Estimate

$7,000-$8,000

Per 40' High Cube container (14 units each). Dependent on market conditions and subject to change

🚚

Logistics Support

Dedicated Team

Personal coordinator manages all shipping at carrier cost—no markup. From order placement to site delivery

📋

Quote Process

All-Inclusive

Exact pricing before you order—no surprises

💳

Financing Help

Full Support

We guide you through financing options and applications

ContainerHQ Quote Builder

Quantity Container Type & Pricing Configuration Details Total Investment Monthly Rent/Unit Per Sq Ft
8×20 Single Door
i
8x20 Single Door Container
$2,800 per container
1 Unit • 8×20 • 160 sq ft
$0 $1.20
8×20 Double Door
i
8x20 Double Door Container
$3,200 per container
2 Units • 8×10 • 80 sq ft each
$0 $1.25
4-Unit Container
i
4-Unit Container
$4,000 per container
4 Units • 8×5 • 40 sq ft each
$0 $1.50
Subtotal
0 Containers • 0 Units
$0
0/14 (0 Shipments)
Add 0 containers for full shipment
Project Analysis
Container Type Quantity Quantity of Units Total Sq Ft Monthly Rent Annual Rent
8×20 Single Door 0 0 0 sq ft $0 $0
8×20 Double Door (2 units) 0 0 0 sq ft $0 $0
4-Unit Container (4 units) 0 0 0 sq ft $0 $0
Total 0 0 0 sq ft $0 $0
Included with Every Unit:
Diamond Pattern Treadplate Flooring
Color Matching on All Units
Interior Divider Walls
All Mounting Hardware Included
Shipping Details (estimate)
Click to view breakdown
$0 - $0
Assembly Options
Choose your preferred assembly method
$0
Financing Fee (optional)
PO funding option available
$0
Duties and Tariffs (estimate)
$0
Sales Tax (estimate)
Click to view breakdown
$0

Investment Summary

Complete project analysis and financial projections

Total Investment Required
$0
UNITS
$0
SHIPPING
$0
DUTIES
$0
TAXES
$0
ASSEMBLY
$0
FINANCING
$0

Revenue Projections

Monthly Revenue
$0
Annual Revenue
$0

Performance Metrics

Return on Investment
0%
Payback Period
-- months

Project Specifications

CONTAINERS
0
RENTAL UNITS
0
SQUARE FOOTAGE
0 sq ft
SHIPMENTS
0
EXPORT PDF
EXPORT PNG

Construction Cost Analysis

See how ContainerHQ stacks up against traditional construction methods

✅ ContainerHQ Modular Storage
Ready in weeks, not months • Fast installation
$17.50-$25.00
per sq ft
Excludes shipping, delivery & taxes
❌ Single-Story Traditional Construction
3-5x more expensive
$50-$85
per sq ft
❌ Multi-Story Traditional Construction
5-7x more expensive
$90-$130
per sq ft
❌ Climate Controlled Traditional
3-4x more expensive
$50-$75
per sq ft

Navigating Permitting and Zoning: Let Container HQ do the leg work

Permitting and zoning can be a complex process, especially when dealing with innovative storage solutions like those offered by Container HQ. Our products often fall between traditional categories such as mini warehousing, self-storage, and industrial outdoor parking. This flexibility allows us to shape the narrative to fit local planning or zoning requirements effectively. Here’s how we navigate these challenges and ensure successful project approvals.

Understanding the Challenges

One of the primary challenges we face is that our containers are not bolted to the ground, raising concerns for building departments. They often require detailed plans and engineered drawings to ensure compliance with safety and structural standards. Additionally, if the zoning regulations don’t specifically allow for mobile storage, we must adapt our approach to align with the existing guidelines.

Tailoring the Approach

To successfully navigate the permitting and zoning process, it’s crucial to understand the specific requirements of the zoning staff. These officials are responsible for ensuring that all projects meet community standards and regulations. By tailoring our project proposals to meet their criteria, we can work collaboratively with them to achieve approval.

Structured and Detailed Proposals

Rather than simply stating that we want to use containers, we present a structured and detailed approach. This includes:

Comprehensive Plans: Providing complete and accurate plans and engineered drawings that address all structural and safety concerns.

Customized Narratives: Crafting narratives that demonstrate how our containers fit within the local zoning guidelines and community standards.

Flexibility: Showing our ability to adapt the design and use of our containers to meet specific zoning requirements.

Expediting the Permitting Process

To expedite the permitting process for new sites, it’s essential to provide a complete and well-organized package. This includes all necessary documentation, plans, and evidence that our project aligns with the local regulations. The goal is to make it as easy as possible for the permitting staff to review and approve our project.

Collaboration and Communication

Effective communication with zoning staff is key. By understanding their needs and working collaboratively, we can address any concerns and demonstrate our commitment to meeting community standards. This proactive approach helps build trust and facilitates a smoother approval process.

Navigating the permitting and zoning process can be challenging, but with a well-structured approach and effective communication, Container HQ ensures that our projects meet all necessary requirements. Ready to explore how our flexible storage solutions can fit your needs? Contact Container HQ today at rent@storagehq.ca or call us at 250-661-8610. Let’s work together to bring your storage project to life!